February 3, 2016 by ballyboes Weeks 9 & 10 A NEW BAR HATCH DOOR GOES INA SECRET VIEW OF THE PLAN FOR THE TERRACEANTIQUE FRENCH RADIATORS ARE BEING INSTALLEDBAR SHELVING AND THE LIGHTING ARE NOW INHOPEFULLY THE SCAFFOLDING WILL BE DOWN SOONLARGE MIRRORS WAIT TO GO UPOPENINGS ARE NOW 'FRAMED'THE BAR FRONT IS GOING TO BE INTERESTINGTHE BAR WAITS FOR VARNISHTHE DECKING LOOKS FABULOUSTHE FIRE PLACE TAKES SHAPETHE FRENCH WINDOWS ARE IN LEADING TO THE NEW TERRACETHE FRONT DOOR ARE WAITING FOR THE GLASS TO ARRIVETHE GARDEN AND TERRACE AT THE SIDE OF THE FITZ ARE BEING TIDIEDTHE OLD MIRRORS HAVE ARRIVEDTHE QUARRY TILE FLOOR IS REVEALEDTHE SNUG FIRE PLACE IS NOW REBUILT TO LIFT THE HEIGHT OF THE FIRETHE WROUGHT IRON OVER BAR HAS ARRIVED in refurb 0 comments ShareYou may also likeA Job well done!Weeks 7 & 8Week 6